PLN, Bakrie Build Hybrid Solar Power Plant in Selayar, South Sulawesi
the 1.3-megawatt peak (MWp) PLTS Hybrid Selayar is the largest and the cutting edge in South Sulawesi. According to him, the PLTS Hybrid which was built on an area of 1.46 hectares requires an investment of IDR 39.5 billion.